- Wholesale
- Our solutions
- Our fixed solutions
- Our Network Infrastructure Solutions
- Mobile Network Infrastructure Solutions
- Mobile Ethernet Core 2 (MEC 2)
Mobile Ethernet Core 2 (MEC 2)
Connect all of your mobile sites to your central sites via Orange’s Ethernet network
This solution concentrates your antenna sites’ Ethernet connections on your central sites, with delivery to 24 collection regions in mainland France and within overseas departments.
Based on fibre optic or radio transmission technology, MEC 2 already has more than 10,000 connected antenna sites that are benefiting from a virtually unlimited increased throughput, thanks to the majority use of fibre optics.
Benefits
- Take advantage of an extended coverage area, with over 36,000 open municipalities.
- Benefit from engineering based on the largest fibre optic network in France.
- Get a highly flexible solution that lets you transport all types of mobile flows, including 4G+.
- Benefit from maximum security thanks to a double connection of central sites.
Find out more
Uses
Do you want to build your own sustainable network?
Fibre optic or radio transmission connection is carried out using a tried and tested production process, ensuring a solid and sustainable structure.
Do you want to have a scalable network?
With Mobile Ethernet Core 2, throughput is guaranteed to increase remotely within 14 days. In addition, you will benefit from virtually unlimited increased throughput thanks to fibre optics.
Do you want to secure your connections?
We guarantee maximum security with a double connection at the central site, reinforced by two distinct pathways.
Avec Core Ethernet Mobile 2, la montée en débit se fait à distance dans un délai garanti de 14 jours. De plus, vous bénéficiez d’une montée en débit quasi illimitée grâce à la fibre optique.
Technical criteria
- Have mobile equipment with Ethernet interfaces
- Have a central site in each Ethernet region containing antenna sites that need to be connected
Legal criteria
- Be a mobile Operator in mainland France or in overseas departments
- Be a subscriber to the Integrated Access to Mobile Operator Capillary Networks (IAMOCN) solution or the Mobile Ethernet Core 2 (MEC 2) solution
Order and make appointments
Pre-qualify orders, make quotations
Steps
FAQ
If Orange has already connected the antenna site with fibre, the average time is 8 weeks. If the site is not yet connected with fibre, the average time is 12 weeks.
The lead time provided in the feasibility study results is binding and becomes contractual (agreed delivery date) once the firm order has been placed by the client. The agreed date can only be changed if, during the Client Operations Plan (COP), it is discovered that extensive works need to be carried out by the client.
We provide you with two methods to keep track of the installation stages for a Mobile Ethernet Core 2 access:
- via the Data Monitoring app, you can view all the necessary information on the installation of your mobile Ethernet accesses.
- via the provision of a Project Production Manager (PPM), throughout the duration of the contract (basic service provided at no extra cost). S/he will give you regular reports.
The prices sent back to you in the results of the feasibility study include any Exceptional Construction Difficulties that may arise. The amount quoted can under no circumstances be changed during the firm order phase.